Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 10/15/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE APPROVED COUPLING FOR PIPING 2. SHALL SECURE PIPING AT APPLIANCES AND DROP TO METER 3. SHALL PROVIDE BONDING FOR BUILDING GAS PIPING 4. SHALL PROVIDE APPROVED GAS SHUT OFF ON EXTERIOR AND AT BOTH APPLIANCES 5. COMPLETE GAS PIPING TO APPLIANCE SHUT OFF VALVES BOTH APPLIANCES REQUIRE SEPARATE VALVES. |