Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SHOP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2007 | SIGN SHOP | Approved | IVRS - Inspection :* | |
| 09/04/2007 | SIGN SHOP | Partial Approval | IVRS - Inspection :* 1. LIGHT TO BE AHEAD OF TIME CLOCK 2. FINISH #10 ENGINEER |
|
| 08/24/2007 | SIGN SHOP | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. SWITCH TO BE ORIENTED TO UP POSITION IS ON 2. ONLY ONE CONDUCTOR UNDER A SCREW TERMINAL 3. FINISH ITEMS 2, 4, 5, 7, 9 & 10 |
|
| 08/23/2007 | SIGN SHOP | Not ready for Inspection | IVRS - Inspection :* | |
| 08/14/2007 | SIGN SHOP | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* FINISH PREVIOUS ITEM |
|
| 08/10/2007 | SIGN SHOP | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) A SERVICE LIGHT IS NEEDED 210.70 2) TIGHTEN LOOSE FITTINGS 3) USE APPROVED FITTINGS WITH M/C CABLE 4) BOX OVER FILLED 5) GROUND TRANSFORMER ENCLOSURE 6) SECURELY MOUNT POWER SUPPLY TO ENCLOSURE 7) A SWITCH IS NEEDED PER 600.6 8) FINISH MAKE UP 9) MARKING LABELS IS NEEDED 10) HAVE STRUCTURAL ENGINEER VERIFY DRILLING THROUGH SUPPORT POST 11) SUPPLY POWER TO SIGNS |
|
| 08/09/2007 | SIGN SHOP | Not ready for Inspection | IVRS - Inspection :* | |
| 07/31/2007 | SIGN SHOP | Not ready for Inspection | IVRS - Inspection :* | |
| 07/30/2007 | SIGN SHOP | Not ready for Inspection | IVRS - Inspection :* CANCELLED BY CREW -- NOT FINISHED |
|
| 07/26/2007 | SIGN SHOP | Not ready for Inspection | IVRS - Inspection :* CANCELLED |
|
| 07/17/2007 | SIGN SHOP | Partial Approval | IVRS - Inspection :* | |
| 07/12/2007 | SIGN SHOP | Partial Approval | IVRS - Inspection :* 1. PLEASE VERIFY LISTING OF ENT & FITTINGS 362.6/725.51 2. DO NOT ENERGIZE SIGN UNTIL FINALED BY ELECTRICAL INSPECTOR OK LETTER SETS |