Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2007 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE |
|
| 11/05/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. LEVEL UNIT 2. PROVIDE ROOF JACK AT ALL CONDUITS INSTALLED 3. VERIFY 2" INSULATION IN ROOFTOP DUCT 4. PROVIDE LATEX PAINT (NOT ENAMEL) ON ALL PVC ON ROOF 5. MECHANICAL CONTRACTOR TO BE PRESENT WITH TOOLS AND PATCH MATERIAL UPON NEXT INSPECTION. |