Inspection History Details
Inspection Status: Denied
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2008 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* COMPLETE ALL ITEMS LISTED |
|
| 08/24/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLEASE SCHEDULE AN INSPECTION WHEN SOMEONE WILL BE HOME |
|
| 07/09/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE INSTALL INSTRUCTIONS FOR CONDENSATE PUMP MOST PUMPS CANNOT BE INSTALLED IN AN AIR PLENUM 2. PROVIDE A TRAP ON CONDENSATE DRAIN. PROVIDE AN OVERFLOW SENSOR ON SECONDARY DRAIN. CONNECT OVERFLOW SENSOR ON PUMP. PROVIDE HOSE CLAMP ON PUMP HOSE. DO NOT CUT THE PLUG OFF OF THE PUMP CORD. FUSE STAT IS NOT REQUIRED. 3. GAS FLEX CANNOT PASS THRU THE FURNACE CABINET PROVIDE A SEDIMENT TRAP IN GAS LINE AT FURNACE 4. LAST FITTING ON VENT CONNECTOR UPSIDE DOWN 5. 3/8" I.D GAS FLEX NOT ADEQUATE FOR 100,000 BTU 6. PROVIDE A GFI SERVICE RECEPTACLE ON ROOF. SECURE ELEC. CONDUIT ON ROOF. LOW VOLTAGE WIRE ON ROOF MUST BE PROTECTED FROM DAMAGE. PROVIDE A ROOF JACK AT ELEC. PENETRATION THRU ROOF. EXTEND CONDENSATE DRAIN TO RAIN GUTTER & BLOCK AND CLAMP EVERY 6' 7. DO NOT USE WHITE WIRE IN DISCONNECT 8. PROVIDE VIBRATION ISOLATORS. |