Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2007 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/02/2007 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* - PROVIDE AN OVERFLOW SENSOR ON SECONDARY DRAIN OUTLET ON COIL. - DO NOT TAKE THE PLUG OFF OF THE CONDENSATE PUMP - INSULATE THE UNINSULATED SLEEVE IN FURNACE ROOM - PROVIDE HOSE CLAMPS ON CONDENSATE PUMP HOSE |
|
| 06/20/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) A/C UNIT NEEDS VENTED TRAP 2) DRAIN LINE CANNOT BE DRAINED INTO A ROOF VENT NEEDS TO TERMINATE OUTSIDE ON GROUND CONDENSATE DISPOSAL M1411.3 3) NEED TO SECURE INSULATED LINES AT AIR HANDLER |