Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2010 | MECHANICAL - FINAL | Approved | ||
| 06/08/2007 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* PUMPED CONDENSATE TO TERMINATE AT AREA THAT CAN ABSORB DISCHARGE. 1. SHALL PROVIDE PERMIT FOR NEW RINNAI WATER HEATER 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN SHALL GRAVITY DRAIN TO DAYLIGHT. 3. THIS EXISTING 1" GAS SYSTEM IS UNDERSIZED TO MEET THE GAS DEMAND OF 180,000 BTU WATER HEATER AND THE BTU DEMAND OF THE NEW FURNACE. |