Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2007 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* REINSPECTION LATER IN DAY 2:45 WATER HEATER TO BE SEPARATE PERMIT BY A DIFFERENT CONTRACTOR WITH INSPECTION. |
|
| 02/28/2007 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. WATER HEATER TO HAVE FULL SIZE TEMPERATURE & PRESSURE RELIEF DRAIN, GRAVITY DRAIN TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL FOR ALTERNATE FORM OF TEMPERATURE & PRESSURE RELIEF WITH CORRECT INSTALLATION. 2. PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES. 3. PROVIDE SEDIMENT TRAPS AT GAS ENTRY TO FURNACE & WATER HEATER. 4. CONNECT ALL GAS PIPING TO GAS SYSTEM AND PROVIDE FULL SYSTEM TEST 5. WATER HEATER PIPING TO BE MINIMUM 3 1/2" ABOVE GRADE AT WATER HEATER |