Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2009 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 01/06/2009 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* FAU UNIT FLUE PIPING RUN BACKWARDS |
|
| 02/01/2008 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* WATER HEATER FLUE PIPE NEEDS TO BE PROPERLY STRAPPED AND SUPPORTED. PROVIDE 1" CLEARANCE TO COMBUSTIBLES (SHEETROCK, WOOD) ON B-VENT. PROVIDE SECONDARY DRAIN ON EVAP. COIL EXPOSED EXTERIOR PVC PIPING IS TO BE PAINTED WITH LATEX CONDENSATE PIPING CANNOT TERMINATE ON A HARD SURFACE ALL PVC JOINTS MUST BE PRIMED PRIOR TO GLUE. |
|
| 02/26/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTES ABOVE & COMPLY WITH THEM. FAILURE TO DO SO WILL RESULT IN REFEE |
|
| 02/21/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE CORRECT FUSES FOR RATING PLATE AT OUTDOOR SECTION. 2. SHALL PROVIDE SEPARATE DRAIN FOR SECONDARY DRAIN PAN. 3. CONDENSATE DRAIN TO BE SEPARATE FROM PAN DRAIN AND HAVE CORRECT FALL. 4. PROVIDE INSTALLATION INSTRUCTION MANUAL FOR FURNACE TO VERIFY HORIZONTAL INSTALL & POSSIBLE HEAT SHIELDING REQUIREMENTS. |