Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2007 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* | |
| 01/24/2007 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE APPROVED TAPE PRIMER & TAPE ON ALL BURIED FITTINGS & TOOL MARKS. 2. 10 PSI TEST IS OK - LEFT GAS CARD 3. PROVIDE SCREWS AT WATER VENT CONNECTION TO THE DRAFT DIVERTER. 4. INSULATE EXPOSED SUPPLY DUCT ON ROOF WITH 2" R-8 DUCT LINER. 1" LINER IS ONLY R4.2 SEE 2003 I.E.C.C |
|
| 01/19/2007 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. THIS IS ALSO A GAS REPIPE 2. EXPOSE NEW BELOW GRADE GAS PIPING - MUST HAVE FACTORY COATING. 3. PROVIDE 3/4" PIPING TO BE AS CLOSE TO GAS PACK AS POSSIBLE. 4. SECURE GAS PIPING DROP TO WH, INSTALL SEDIMENT TRAP AT WH 5. PROVIDE 1" CLEARANCE AT WH FLUE PENETRATION OF ROOF. |