Inspection History Details
Inspection Status: Approved
Inspection History: INSP - AST/UST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/27/2007 | INSP - AST/UST | Approved | All vents have been installed. The tank is approved and permit issued. | |
| 10/29/2007 | INSP - AST/UST | Approved | 3404.2.7.3.3 - Vent pipe outlets: Vent outlets on atmospheric tanks storing Class IIIB liquids are allowed to discharge inside a building if the vent is a normally closed vent. Action Required: Install a normally closed vent |
|
| 10/29/2007 | INSP - AST/UST | Approved | 3404.2.7.4 - Emergency venting: Stationary, above-ground tanks shall be equipped with additional venting that will relieve excessive internal pressure caused by exposure to fires. Required Action: Install approved emergency venting. |