Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Violation
Inspection History: INSP - REINSPECTION
Case Number - T07FR01225
Inspection Description - INSP - REINSPECTION
Inspection Status - Violation
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/22/2007 | INSP - REINSPECTION | Violation | On 8-22-07, a re-inspection was conducted and the following International Fire Code 2003 Violation(s) was noted: 1). Fire evacuation drill shall be conducted. Presently no date has been given to The Tucson Fire Department for conducting this drill. Date shall be determined by 9-13-07. IFC 404.2 2). Currently there are many holes and separation violations in the RATED ceiling and walls of practically all of the mechanical rooms. This is in violation of IFC 703.1 and 703.1.1 which states: 703.1 Maintenance. The required fire-resistance rating of fire-resistance-rated construction (including walls, fire stops, shaft enclosures, partitions and floors) shall be maintained. Such elements shall be properly repaired, restored or replaced when damaged, altered, breached or penetrated. Openings made therein for the passage of pipes, electrical conduit, wires, ducts, air transfer openings, and holes made for any reason shall be protected with approved methods capable of resisting the passage of smoke and fire. Openings through fire-resistance- rated assemblies shall be protected by self-closing or automatic- closing doors of approved construction meeting the fire protection requirements for the assembly. 703.1.1 Fireblocking and draftstopping. Required fireblocking and draftstopping in combustible concealed spaces shall be maintained to provide continuity and integrity of the construction. All holes shall be closed with UL listed materials, approved for the This is a very extensive fire stopping compliance project. The Tucson Fire Department highly recommends a licensed fire-stopping contractor to complete this project. Written documentation of material used shall be reviewed and must be submitted for compliance. All fire stopping must be completed by 9-13-07 3). Fire alarm test shall be submitted and all required repairs shall be completed by 9-13-07 4). The shelving in suite 420 is currently being SEPARATED FROM the wall, with material on the shelves. This situation must be corrected to a safe manner. Storage shall be in a safe manner. This is caused by an unsafe load/weight This material is in danger of collapsing. IFC 110.11 All storage must be removed from shelving by 8-30-07 5). Fire Sprinkler zone shutoffs shall be labeled. IFC App 3-c This letter is to inform you that abatement of these Tucson Fire Code violations must be completed by 9-13-07. A re-inspection shall be conducted at that time to ensure compliance. |