Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T07FR00813

Parcel: 110113730

Inspection Status: Approved

Inspection History: VIOL - BUILDING SVCS & SYSTEMS

Case Number - T07FR00813

Inspection Description - VIOL - BUILDING SVCS & SYSTEMS

Inspection Status - Approved

Date Description Inspector Results Comments
05/25/2007 VIOL - BUILDING SVCS & SYSTEMS Approved
04/26/2007 VIOL - BUILDING SVCS & SYSTEMS Violation Open wire boxes/ splices:
TFC 605.6 Unapproved conditions. Open junction boxes and open-wiring splices shall be prohibited. Approved covers shall be provided for all switch and electrical outlet boxes.

______Cover wires in an approved manner. [5 locations]
04/26/2007 VIOL - BUILDING SVCS & SYSTEMS Violation Electric cabinet painted shut:
TFC 605.1 Abatement of electrical hazards. Identified electrical hazards shall be abated.

______ Open breaker cabinet- remove paint seal.
04/26/2007 VIOL - BUILDING SVCS & SYSTEMS Violation Extension cords:
TFC 605.5 Extension cords. Extension cords and flexible cords shall not be a substitute for permanent wiring. Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors, or under doors or floor coverings, nor shall such cords be subject to environmental damage or physical impact. Extension cords shall be used only with portable appliances.

_____Replace with approved power strip.[refrigerator]

Note: With this code reference, please provide proof of the electrical code compliance of the wires passing thru the ceiling, from a licensed electrician.
The above code disallows flexible wire from going thru ceilings or walls.