| 08/14/2007 |
INSP - AST/UST |
|
Approved |
Final inspection on the two 250 gallon lpgtanks complete. They both meet the distance requirements. Permit issued |
| 07/12/2007 |
INSP - AST/UST |
|
Continued |
Concrete LPG pads have been extended. Tanks are not installed yet. |
| 07/11/2007 |
INSP - AST/UST |
|
Continued |
SI- LPG not ready |
| 06/07/2007 |
INSP - AST/UST |
|
Continued |
Lpg tanks not in place. Concrete still needs to be poured. |
| 06/05/2007 |
INSP - AST/UST |
|
Continued |
Performed the piping pressure test on the 10000 gallon diesel tank. Passed. Venting approved. Final should be next week. |
| 05/24/2007 |
INSP - AST/UST |
|
Continued |
Not ready for inspection. Piping nneds to be inspected by plumbing inspector. Inspected the 10K diesel, all vents in place. allowed fueling for calibration and set up. no electrical to the tank. fuel is drawn by generators. |
| 05/15/2007 |
INSP - AST/UST |
|
Continued |
SI- Concrete pads for two 250 gallon LPG tanks poured. Distance from condensers is good. 10000 gallon UL-2085 in place. piping installe and will get a mechanical inspection. venting requirements discussed. Vents to be used are of an approved type. Final expected in about 2 weeks |
| 04/23/2007 |
INSP - AST/UST |
|
Continued |
Met with MikePolivchak 275-0423. Did a site investigation of location of diesel and LPG tanks. LPG tanks are going to be relocated to gain 10 foot clearence from AC condensers. |