Inspection Status: Approved
Inspection History: INSP - AST/UST
| Date |
Description |
Inspector |
Results |
Comments |
| 09/18/2007 |
INSP - AST/UST |
|
Approved |
|
| 03/26/2007 |
INSP - AST/UST |
|
Continued |
Site inspection to begin process of bringing hospital into compliance with IFC. Several tanks identified without permits, back-up power for hospital is on line (no permit). Requested Gary Simmons of BFL Construction to get permit for temporary power. This is a joint venture with Sundt (Rod Campbell). Sturgeon and Stark are the 2 electrical companies on site. Met with Rod of SW Fuel Care and issued permit to alter 20K diesel tank. He will be removing fuel and cleaning tank tomorrow. |