Inspection Status: Approved
Inspection History: VIOL - FLAMMABLE LIQUIDS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2007 | VIOL - FLAMMABLE LIQUIDS | Approved | ||
| 03/21/2007 | VIOL - FLAMMABLE LIQUIDS | Continued | Met with Ed Berry. The old AST was removed the week of 03-12-07 by Union distributers without authorization or permit. | |
| 03/08/2007 | VIOL - FLAMMABLE LIQUIDS | Correction Required | 3404.2.14.1 Removal. Removal of above-ground and underground tanks shall be in accordance with all of the following: 1. Flammable and combustible liquids shall be removed from the tank and connecting piping. 4. Tank openings shall be capped or plugged, leaving a 0.125-inch to 0.25-inch-diameter (3.2 mm to 6.4 mm) opening for pressure equalization. 5. Tanks shall be purged of vapor and inserted prior to removal. |