Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T07FR00304

Parcel: 135074450


Addresses:

1601 S PANTANO RD


Inspection Status: Approved

Inspection History: VIOL - BUILDING SVCS & SYSTEMS

Case Number - T07FR00304

Inspection Description - VIOL - BUILDING SVCS & SYSTEMS

Inspection Status - Approved

Date Description Inspector Results Comments
02/27/2007 VIOL - BUILDING SVCS & SYSTEMS Approved 1. Panels clear.
2. Extension cords removed.
3. Switch blanks installed.
02/09/2007 VIOL - BUILDING SVCS & SYSTEMS Approved 1. Blocked electrical panels.
605.3 Working spaces. The working space shall not be less than the width of the electrical service equipment. No storage of any materials shall be located within the designated working space. TFC2003
***Unblock Electrical Panels.
02/09/2007 VIOL - BUILDING SVCS & SYSTEMS Violation 2. Extension Cords in use to power permanent equipment in Imaging, Pre-press rooms.
605.5 Extension cords. Extension cords and flexible cords shall
not be a substitute for permanent wiring. Extension cords and
flexible cords shall not be affixed to structures, extended
through walls, ceilings or floors, or under doors or floor coverings,
nor shall such cords be subject to environmental damage or
physical impact. Extension cords shall be used only with portable
appliances. TFC2003
***Remove extension cords and replace with UL/FM approved power strips.
02/09/2007 VIOL - BUILDING SVCS & SYSTEMS Violation 3. Electrical panel missing switch covers.
4. Blank outlet cover needed on missing outlet.
605.6 Unapproved conditions. Open junction boxes and
open-wiring splices shall be prohibited. Approved covers shall
be provided for all switch and electrical outlet boxes.TFC2003
***Install switch cover plates in all missing locations in electrical panels.