Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - MEANS OF EGRESS
Case Number - T07FR00057
Inspection Description - VIOL - MEANS OF EGRESS
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2007 | VIOL - MEANS OF EGRESS | Approved | corrected | |
| 01/09/2007 | VIOL - MEANS OF EGRESS | Correction Required | 1016.2 Corridor width. The minimum corridor width shall be as determined in Section 1005.1, but not less than 44 inches (1118 mm). -Maintain exit corridor width |
|
| 01/09/2007 | VIOL - MEANS OF EGRESS | Correction Required | 1006.3 Illumination emergency power. The power supply for means of egress illumination shall normally be provided by the premise's electrical supply. The emergency power system shall provide power for duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or an on-site generator. The installation of the emergency power system shall be in accordance with Section 604. -Exit sign in the stock room shall have back up power |