Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 12/05/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) INSTALL BREAKERS LISTED FOR USE IN SIEMENS PANEL 2) INSTALL PROPER SIZE STRAPS ON MAST |
|
| 11/23/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. REMOVE STRAP FROM IN FRONT OF SERVICE PANEL 2. PROVIDE PROTECTIVE BUSHING WHERE CABLES ENTER 3/4" EMT 3. CAN ONLY LOCATE ONE GROUND ROD - PLEASE UNCOVER AND MARK 4. STRAP MAST TO BUILDING USING 1/4" HARDWARE MIN. 5. CONNECT SERVICE CONDUCTORS TO OVERHEAD POSITION IN METER SECTION 6. MIN. SIZE SERVICE CONDUCTORS FOR 200 AMP IS 2/0 COPPER OR 4/0 AL 7. INSTALL BREAKERS LISTED FOR USE IN SIEMENS PANEL 8. SEAL OPEN KNOCKOUTS 9. SEAL OPENING WHERE WIRES ENTER BACK OF PANEL WITH NON-COMBUSTIBLE MATERIAL 10. CONNECT ALL GROUNDS TO GROUND BAR SEE MAX # PER TERMINATION ON PANEL COVER 11. CHECK ALL STRANDS UNDER TERMINALS 12. ARE THERE SPIKES IN LB? NEED 6" MIN. OF FREE CONDUCTOR LENGTH. CHECK WIRE FILL ON LB 13. STRAP SEAL TIGHT TO AC DISCONNECT |