Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 11/16/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) NEED HOLDOWN DEVICE FOR BACK FED MAIN BREAKER 2) NEED 2 GROUND RODS FOR SUB PANEL 3) NEUTRAL NOT TO MAKE CONNECTION TO GROUND IN SUB PANEL 4) IDENTIFY ADDRESS ON PANEL WITH METAL ADDRESS TAG |
|
| 11/09/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 11/08/2007 | ELECTRIC - FINAL | Denied | SUBMIT PLAN AND HAVE THEM APPROVED BY THE CITY OF TUCSON PLAN REVIEW | |
| 11/07/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SEE WRITE UP FROM T07EL01741 2. CALL BOTH ACTIVITIES AT THE SAME TIME 3. INSTALL DISCONNECTING MEANS AT 2730 NEC 225.31 & 225.32 4. INSTALL GROUNDING ELECTRODE SYSTEM AT 2730 NEC 250.32 5. BRANCH CIRCUITS ALL ON SAME PHASE CANNOT SHARE NEUTRAL. INSTALL NEUTRALS FOR EACH BRANCH CIRCUIT THIS IS NOT A MULTI-WIRE BRANCH CIRCUIT 6. COMMON AREA BRANCH CIRCUITS NEED TO BE SUPPLIED FROM SEPARATE HOUSE SERVICE. NEC 210.25 7. PROVIDE DETAILED PANEL SCHEDULE -- NEC 408.4 |