Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T07EL01938
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/23/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
01/15/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* PLANS TO BE ON SITE |
|
12/12/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. USE APPROVED FITTING WITH LB AND BOND AT SERVICE 2. ONLY ONE CONDUCTOR PER TERMINAL LUG 3. MAINTAIN WORKING CLEARANCE 4. ATTACH GROUNDS TO STRUCTURE 5. REPLACE CONDUCTOR WITH TAPE WITH INSULATED GROUNDED CONDUCTOR 6. SEAL ENTRANCES ABOVE CURRENT CARRING PARTS 7. CLOSE JUNCTION BOX IN BASEMENT 8. A PERMIT IS NEEDED FOR NEW AC UNITS |
|
11/07/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* ROOF: NO MORE THAN 360 DEG. IN A CONDUIT RUN 1. FINISH PREVIOUS ITEMS 2. PLEASE VERIFY PERMIT FOR NEW ROOF AC UNITS |
|
11/05/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. MAINTAIN WORKING CLEARANCES IN FRONT OF SERVICE 110.26 2. VERIFY NEW GROUNDING ELECTRODE SYSTEM & GAS & WATER BONDS 3. PROTECT CONDUCTORS 300.4 4. FITTING TO BE LISTED FOR BONDING 5. PANED SCHEDULES TO BE AS PER 408.4 - NO GENERAL LABELING OR ABBREVIATIONS 6. SEAL ENTRANCES ABOVE CURENT CARRING PARTS WITH APPROVED DEVICES 7. VERIFY INTERIOR CIRCUIT AMPACITIES 8. USE LISTED & APPROVED FITTINGS FOR WET LOCATION 9. SUPPORT CONDUITS AS PER CODE 10. TIGHTEN FITTINGS 11. PROVIDE ROOF ACCESS TO INSPECT CONDUIT & JUNCTION BOXES |