Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 11/21/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* REPAIR DAMAGED INSULATOR ON WEATHERHEAD, BROKEN OUT, SHARP EDGES MAY CAUSE DAMAGE TO CONDUCTOR INSULATION. |
|
| 11/14/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. BOND GAS & WATER PIPING NEC 250 2. SECURE GROUNDING ELECTRODE CONDUCTOR & BONDING JUMPERS TO BUILDING SURFACE NEC 250 3. MARK & UNCOVER GROUND RODS 4. USE 1/4" LUG BOLTS OR WOOD SCREWS TO SECURE MAST TO BUILDING 5. CONNECT WIRES TO OVERHEAD POSITION IN METER SECTION SEE PANEL DOOR FOR INSTRUCTIONS NEC 110 6. PROPERLY IDENTIFY NEUTRALS TO SUB-PANELS - NEC 200 7. NOT ALL STRANDS OF NEUTRAL UNDER TERMINAL IN PANEL |
|
| 11/13/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* |