Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* THIS IS FOR A DUPLEX |
|
| 06/19/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SERVICE (ORIGINAL) IS TO BE USED AS LISTED - NOT TO FEED ANOTHER SERVICE, USE 3-GANG METER SERVICE INSTEAD 2. SINGLE FLOOD LIGHT NOT REASON TO CLEAR - PROVIDE INFORMATION ON WHAT LOADS AND FUTURE WORK IS TO BE DONE |
|
| 06/12/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* ELECTRICAL CONTRACTOR TO BE ON SITE FOR INSPECTION TO OPEN EQUIPMENT & PROVIDE EXPLANATION OF INSTALLATION 100 AMP SERVICE FOR 1 FLOOD LIGHT? |
|
| 02/21/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NOT INSTALLED PER PLAN. PLAN DOES NOT SHOW PANEL OR FEEDER SIZE. ALL THIS FOR ONE FLOODLIGHT WHAT ELSE IS BEING ADDED TO PANEL? TALKED WITH OWNER & EXPLAINED HE SHOULD REVISE PLANS WITH LOAD CALCULATIONS ON EXISTING SERVICE AND LOAD CALCULATIONS FOR FUTURE LOADS |