Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 07/26/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. GROUND RODS TO BE A MINIMUM 6' APART AND DRIVEN FLUSH TO GRADE 2. TIGHTEN ACORNS AND ALL BOND CLAMPS SCREWS 3. IDENTIFY PANEL DIRECTORY 4. TERMINATE BRANCH CKT'S WITH SHARED NEUTRAL ON SEPARATE PHASES 5. BURY GAS BONDING CONDUCTOR DEEPER OR SECURE TO STRUCTURE 6. PROVIDE A LADDER FOR ROOFTOP ACCESS |