Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T07EL01295
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 07/16/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/12/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SERVICE CONDUCTORS NEED TO BE LISTED FOR SUNLIGHT RESISTANCE 2. NEED TO INSTALL GROUNDING ELECTRODE SYSTEM NEC 250 3. NEED TO BOND WASTE PIPING - NEC 250.104 4. INSTALL MAIN BONDING JUMPER 5. INSTALL PLATFORM IN FRONT OF SERVICE EQUIPMENT TO BRING CENTER OF HANDLE TO 6'7" PLATFORM TO BE 30" WIDE X 36" DEEP |