Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 07/05/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. CONNECT OVERHEAD SERVICE CONDUCTORS TO OVERHEAD POSITION IN METER ENCLOSURE 2. LUG IN JUNCTION BOX RATED FOR 1 WIRE TERMINATION 3. SOUTHWEST GAS REQUIRES 3FT CLEARANCE FROM VACUUM BREAK TO ELECTRIC SERVICE 4. IS TEP GOING TO RELOCATE OVERHEAD SERVICE CONDUCTORS SO THEY DO NOT PASS OVER PORCH ROOF. NEED TO MEET CLEARANCE REQUIREMENTS OF NEC 230.26 & 230.24 5. CLEARLY MARK BRANCH CIRCUITS PER NEC 408.4 |