Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 08/10/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) STILL NEED TO INSTALL MAIN BONDING JUMPER PER NEC 250.28 |
|
| 08/07/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PREVIOUS INSPECTION ITEMS STILL NOT CORRECTED FROM INSPECTION ON 6/15/07. CORRECT ALL ITEMS BEFORE NEXT INSPECTION 2. ALUMINUM & COPPER CONDUCTORS CANNOT BE SPLICED TOGETHER |
|
| 06/15/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COMPLETE ITEMS 3, 4, 5 & 9 FROM INSPECTION ON 6/13/07 2) GEC TO B E CONTINOUS TO GROUNDING ELECTRODE NEC 250.64 3) GROUND RODS TO BE MINIMUM 6' APART NEC 250.56 AND 250.53 4) CANNOT VERIFY GAS BOND 5) COMPLETE ALL ITEMS PRIOR TO NEXT INSPECTION TO AVOID REFEE |
|
| 06/13/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SERVICE ENERGIZED PRIOR TO APPROVALS 2) LABEL SERVICE DISCONNECT PER NEC 230.70 3) BOND CLOSE NIPPLE AT SERVICE RISER PER NEC 250.92 AND 250.102 4) INSTALL GROUNDING ELECTRODES AND GROUNDING ELECTRODE CONDUCTOR PER SECTION III OF NEC 250 5) INSTALL MAIN BONDING JUMPER PER NEC 250.28 6) INSTALL GROUND BAR LISTED FOR USE WITH PANEL. CANNOT CONNECT GROUNDS USING SHEET METAL SCREWS NEC 110.9 7) CONNECT GROUNDS TO GROUND BAR PER MANUFACTURERS INSTRUCTIONS NEC 110.3 8) SEAL OPENING IN BACK OF PANEL WITH NON COMBUSTIBLE MATERIAL 9) NEED DETAILED PANEL SCHEDULE PER NEC 408.4 10) WHERE IS GROUND AND NEUTRAL FOR DRYER CIRCUIT ? 11) INSTALL SPLIT BREAKERS IN PROPER POSITIONS IN PANEL DO NOT BREAK OFF REJECTION TAB NEC 110.3 12) NEED TO BOND AROUND REDUCING WASHERS PER NEC 250.96 |