Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 07/03/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. ELECTRIC SERVICE UPGRADE IS OK 2. POWER WILL NOT BE RELEASED TO TEP UNTIL ALL NEW WORK IS PERMITTED. THIS INCLUDES THE NEW ADDITION & NEW AC UNIT. |
|
| 06/26/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. REVISE PERMIT FOR 200 AMP SERVICE UPGRADE 2. COMPLETE ITEM #1 FROM PREVIOUS INSPECTION 3. OLD SERVICE WAS 60 AMP REFEEDING OLD WIRES WITH 100 AMP VERIFY SIZE & RATING OF OLD SERVICE CABLE. 4. SECURE JUNCTION BOX & CABLES IN ATTIC 5. GROUND JUNCTION BOX WITH FULL SIZE GROUND 6. CAN ONLY EXIT SERVICE PANEL ON RIGHT SIDE OF TOP END PANEL. 7. POA TO BE SUCH THAT ROOF & GROUND CLEARANCES ARE MET. NEC 230.26 & 230.24 8. WILL NOT RELEASE POWER UNTIL ALL NEW WORK IS PERMITTED. |
|
| 05/25/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE DETAILS OF ALL WORK THAT WAS DONE. 2. PVC PIPE NOT INSTALLED PER CODE. NEC 352 3. SEAL ALL OPEN KNOCK OUTS 4. IF GROUND RODS ARE NEW NEED TO INSTALL 2 MIN. 6' APART AND NEED TO BE COMPLETELY DRIVEN. 5. PROVIDE ACCESS TO INTERIOR. |