Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2008 | ELECTRIC - FINAL | Approved | ||
| 01/04/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 10/04/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/10/2007 | ELECTRIC - FINAL | Cancelled | ||
| 07/10/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 05/24/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL BREAKERS LISTED FOR USE IN PANEL - NEC 110.3 2. PANEL DIRECTORY PER NEC 408.4 3. ONE NEUTRAL PER TERMINAL NEC 408.21 4. EXTEND GROUNDING CONDUCTOR & TERMINATE AT GROUND BAR. CANNOT BE SPLICED WITH NEUTRAL CONDUCTOR. 5. INSTALL BUSHING AT HOLE IN BACK OF PANEL TO PROTECT WIRES NEC 300 6. REIDENTIFY WHITE WIRE ON 2 POLE 30 USED AS PHASE CONDUCTOR NEC 200.7 7. SECURE EMT WITHIN 3' OF PANEL - NEC 358.30 8. INSTALL CONNECTOR PROPERLY ON 3/4" EMT - NEC 110.3 9. CANNOT USE ROMEX IN WET LOCATION. ROMEX RUN IN 3/4" EMT -- NEC 334.12 & 100 10. PLEASE VERIFY PERMIT FOR NEW AC UNIT 11. INSTALL GROUND RODS PER NEC 250.52, 250.53, 250.56, 250.64 12. BOND GAS & WATER PIPE PER NEC 250.104 13. SERVICE ENERGIZED PRIOR TO APPROVALS 14. PROTECT WIRE RUN THROUGH 1/2" EMT WITH PLASTIC BUSHING & SECURE 1/2" EMT PER NEC 312.5 & 300.15 15. INSTALL ROOF JACK ON RISER 16. SECURE RISER TO BUILDING. |