Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 05/31/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - #3 CLEARANCE TO SERVICE INSUFFICIENT - 3' OUT IN FRONT OF AT A LEVEL GRADE LAST BLOCK RUN IN WAY - #5 SEE NEC |
|
| 05/16/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CORRECTIONS NOT COMPLETED |
|
| 05/10/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PARTIAL INSPECTION ONLY 1. IDENTIFY NEUTRAL WHERE IT LEAVES WEATHERHEAD - NEC 200 2. INSTALL MAST BRACE AT AN ANGLE THAT WILL BE EFFECTIVE, NOT OFF TO THE SIDE AND SECURE FEET INTO STRUCTURE NOT JUST ROOF SHEATING - - NEC 230 3. SERVICE TO HAVE PROPER FRONT ENTRY CLEARANCE NEC 110 4. DRIVE GROUND RODS INTO EARTH, NOT RAISED PLANTER BED -- NEC 250 5. NEUTRALS #6 AND SMALLER TO BE WHITE ENTIRE LENGTH NEC 200 6. SELF TAP SCREWS NOT ALLOWED FOR GROUND CONNECTION -- NEC 250 7. REMOVE PAINT UNDER GROUND LUGS -- NEC 250 8. W.P ENCLOSURE TO HAVE SEALING TYPE LOCKNUT FOR SIDE ENTRY -- NEC 110, 314 9. 2 GANG W.P BOX IS OVERFILLED -- NEC 314 10. PROVIDE ACCESS TO WATER/GAS BOND THIS SERVICE HAS BEEN ENERGIZED BEFORE APPROVAL. |