Inspection History Details
Inspection Status: Partial Approval
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. WIRING IN SOUTH 1/2 OF STRUCTURE NOT TO CODE. PLANS NOT COMPLETE. 2. NEW WIRING AT SERVICE FOR BRANCH CIRCUITING ETC. HOW ARE YOU GOING TO TIE IN TO DWELLING. |
|
| 06/01/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PAY REFEE @ 201 N. STONE |
|
| 05/25/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SERVICE NOT GROUNDED PER CODE AS PER NOTE #4 2 GROUND RODS REQUIRED 6' MIN. APART PER 250 NEC BOND WATER & GAS PIPING. 2. UNIT LOCKED, MUST BE OPEN FOR INSP. 3. WORK TO BE DONE BY QUALIFIED PERSONNEL. |
|
| 04/04/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. CHANGE ADDRESS ON PERMIT TO CORRECT IF TWO UNITS AT THIS ADDRESS THEY MUST BE DESIGNATED #1 OR #2 2. PERMIT IS REQUIRED FOR ALL NEW INSIDE WORK INCLUDING APPROVED PLANS. 3. TEMP WIRING IS HAZARDOUS & SHOULD BE DISCONNECTED ASAP 4. GROUND SERVICE PER CODE WORK TO BE DONE BY LICENSED OR QUALIFIED ELECTRICIAN HOUSE UNOCCUPIED |