Inspection History Details
Inspection Status: Partial Approval
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) CALL FOR FINAL WHEN ALL WIRING COMPLETE 2) YOU NEED TO CALL IN ALL UNDERGROUND RACEWAYS FOR INSPECTION FOR GATE AREA BEFORE YOU COVER IT |
|
| 05/03/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROPERLY INSTALL G.E.C ONTO ACORNS 2. GROUND RODS TO BE MINIMUM 6' APART AND DRIVEN FLUSH TO GRADE 3. POWER WILL NOT BE RELEASED BEFORE A LOAD IS CONNECTED TO SERVICE ALL WIRING FOR GATE AND LIGHTING TO BE INSPECTED BEFORE COVERED. |