Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2007 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 04/19/2007 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. BONDING JUMPER TO BOND BUSHING TO BE SIZED PER NEC 250.102 REQUIRES #4 2. IDENTIFY NEUTRAL CONDUCTOR FROM METER TO PANEL NEC 200.6 & 200.7 3. INSTALL MAIN BONDING JUMPER PER NEC 250.28 ITS THE COPPER BAR TO PANEL ENCLOSURE 4. CONNECT GROUND AT BELL BOX. MAY NEED TO REPLACE BELL BOX IF CONNECTION STOPPED. 5. NEED PANEL DIRECTORY PER NEC 408.4 6. NEED PENETRUX ON ALUMINUM CONNECTIONS 7. GREY WIRE TO SPLIT BOLT IS IT NEUTRAL OR GROUND? 8. PROVIDE LISTING OF SPLIT BOLT FOR ALUMINUM CONNECTIONS. 9. NEED TO VERIFY PERMIT FOR WATER HEATER 10. SERVICE DISCONNECT TO BE MARKED SERVICE DISCONNECT NEC 230.70 |