Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - PROGRESS
Permit Number - T07EL00412
Inspection Description - ELECTRIC - PROGRESS
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2007 | ELECTRIC - PROGRESS | Approved | IVRS - Inspection :* | |
| 08/09/2007 | ELECTRIC - PROGRESS | Partial Approval | 1. VERIFY BONDING OF METALLIC PIPING IN BLDG, WATER, GAS SPRINKLER 250-104 2. LETTER OF TORQUE RECEIVED BY ABBA 3. DOOR EXIT TO HAVE PANIC HARDWARE PER 110-26 C-2 DOOR TO EQUIPMENT ROOM ALSO TO LOBBY AREA 4. CABLES IN 3-COMPARTMENT WIRE WAY ABOVE SES CABLE TO BE SEPARATED & SUPPORTED 5. ISOLATE CONDUCTORS AT GUTTER WIRE WAY ABOVE NORTH SES SECTION FROM LEANING ON CORNERS 6. ALL OTHER ITEMS TO BE INSPECTED PRIOR TO RELEASE 7. LIMITATION OF 3' FROM GEAR EDGE TO DOOR IS BEING TAKEN UNDER DISCUSSION WITH SUPERVISION IN ORDER TO INFORM OF EXISTING CONDITIONS, THIS ISSUE WILL REMAIN OPEN UNTIL VERIFIED. |
|
| 08/08/2007 | ELECTRIC - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PLEASE HAVE ELECTRICAL CONTRACTOR ON SITE THUR. 8:30 TO REVIEW INSTALLATION 2. INSPECTOR WILL NEED TO BE CALLED FOR ON SAT TO INSPECT FINAL CONNECTION PRIOR TO RELEASE 3. WILL NEED A LETTER FROM CONTRACTOR ON COMPANY LETTERHEAD ON VERFICATION OF TORQUE ON TERMINATION OF SWITCHGEAR AND CONDUCTORS ON LINE SIDE. 4. GROUNDING DETAIL ON PLAN TO BE FOLLOWED SCHEDULE INSPECTION FOR THUR 8/9/07 TO GO OVER INSTALLATION |