Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 02/27/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED TO USE BLACK UV RATED NYLON TIE WRAPS OUTDOORS - WHITE WILL CRACK. 2. CONDUCTORS ENTERING TOP OF PNL A NEED TO BE PHYSICALLY PROTECTED - COVER WHEN LIFTED UP RUBS AGAINST THEM 3. WEATHERHEAD COVER ON RISER MISSING 4. GROUND WIRE WHICH TIES GROUND BUSHING TO TERMINAL IN MAIN DISCONNECT TO BE TAPED GREEN. NOTE: THESE GROUND WIRES WILL BE REMOVED AGAIN BECAUSE THEY ARE SO EXPOSED YOU NEED TO RUN THEM IN PVC OR OTHER TYPE OF PHYSICAL PROTECTION IS MAIN GROUND TIED TO NEUTRALS IN BOTH GUTTERS. |