Case: T07DV05931

Parcel: 116261590

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
07/23/2007 INSP - INITIAL CODE ENFORCMENT Approved VISITED SITE, PRIOR TO RECEIVING PACKET, HECTOR LUCCA HAD PULLED THE PROOF OF PERMITS FOR THE POOL AND THE ELECTRICAL. UPON ARRIVING, I SPOKE WITH DANNY WHO WAS INSTALLING TILE TO THE INSIDE SURFACE OF THE BLOCK WALL. DANNY MENTIONED HE WAS 50-60 PERCENT COMPLETE 3FT THAT HE HAD BEEN ON THE PROJECT FOR APPROX 3 WEEKS. THE POOL ITSELF WAS VERY LARGE AND NEARLY COMPLETE. THE POOL SURROUND WHICH WAS FLAGSTONE LOOKS AS IF IT HAS JUST BEEN STARTED. DANNY SAID AT THIS POINT, THE TILE AND FLAGSTONE ARE WHAT IS SLOWING DOWN THE PROJECT. I ASKED DANNY TO WALK INTO THE ALLEY, THE ALLEY WAS NOT BEING OBSTRUCTED BUT I ASKED THAT SOME OF THE BROKEN BLOCK BE PICKED UP AND REMOVED, THE DIRT BE CLEANED FROM THE PAVED ALLET AND THAT THE SAND PILE GET SHOVELED BACK(IT IS NOT BLOCKING ALLEY EVEN AT THIS TIME) AND THAT SOME OF THE DIRT AND ROCK GET SHOVELED BACK ALSO JUST FOR SAFETY PRECAUTIONS. THEY DID HAVE A PIECE OF METAL BLOCKING THE REAR GATE, AND I ASKED THAT AREA BE CLOSED OFF DAILY. DANNY MENTIONED REAR GATE AREA GETS USED ALOT TO LOAD-UNLOAD MATERIALS AND TOOLS. I ASKED THEY REMOVE VEHICLES THAT MAY BLOCK THE ALLEY. TRIED MAKIN CONTACT WITH MARY CARTER OF THE NEIGHBORHOOD ASSOC, WILL TRY AGAIN.PN