Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
Permit Number - T07CM04797
Inspection Description - FIRE SPKLR - UG, PIPING, HYDRO
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/04/2008 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | UNDER PERMIT T08BU00867 | |
06/05/2008 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Riser #4 stub - APPROVED UG #7 to Riser #14 - both ends to be uncovered to stub out and tee's on main line - APPROVED UG #5 to Riser #12 - both ends to be uncovered to stub out and tee's on main line - APPROVED TEE'S Ok, but unable to see 90 deg elbows to stubs because of concrete poured all around. All ductile iron pipe that was uncovered was wraped with black plastic. STILL NEED TO PRESSURE TEST PIPE AT 200psi FOR 2 HOURS. Also posted on permits T07CM04797 & T07CM04127 & T08BU00867 |
|
06/04/2008 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | UG 10 TO RISER #6 | |
06/03/2008 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | UG 14 to riser #1 - APPROVED D1 6" line - APPROVED B #5 10" line - APPROVED |
|
06/02/2008 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | All of the underground was buried expect approximately 100' on the west end was left open to inspect. Order was given to uncover 10 spots for visual inspection, the following areas are: UG 14 to riser #1 Riser #4 stub UG 11 to Riser #5 UG 10 to Riser #6 D1 6" line B #5 10" line UG #7 to Riser #14 - both ends to be uncovered to stub out and tee's on main line UG #5 to Riser #12 - both ends to be uncovered to stub out and tee's on main line |