Permit: T07CM04797

Parcel: 141220290


Addresses:

8940 E RITA PARK DR


Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T07CM04797

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
12/09/2008 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
11/19/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
GUARD HOUSE CLOSET FLANGES OK
10/29/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
- EWC's AND SINK DWV WATER TEST THRU ROOF A LINE OK
- WATER TO SAME OK
- WATER DISTRIBUTION OVERHEAD PUMPED & COLD
SAME AREA OK
- ALL OVERHEAD DISTRIBUTION OK
- DWV THRU ROOF MAINTENANCE AREAS (2) OK
- WATER DISTRIBUTION THIS AREA OK

1. PROVIDE CORRECT BACKFLOW PROTECTION NO HIGHER THAN 5' AFF OR PLATFORM & LADDER IS REQUIRED AT MAINTENANCE AREA FOR HOSE REELS
2. PROVIDE INFORMATION FOR INSTANT HOTS AT THESE AREAS FOR WATER TEMPERATURE CONTROL TO ALL EYE WASHES TO PREVENT SCALDING
3. YOU ARE REQUIRED TO HAVE YOUR SITE SEWER FINAL INSPECTION APPROVAL WITH PCDEQ AUTHORIZATION TO DISCHARGE PRIOR TO DISCHARGING ANYTHING THRU THE SEWER SYSTEM

YOU ARE ALSO REQUIRED TO HAVE FINAL INSPECTIONS FROM ALL INSPECTORS WITH APPROVAL FOR USE OF FIXTURES IN ADMINISTRATIVE AREA.
09/30/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
DWV WATER TEST TO 2' ABOVE METER ROOF, WATER PIPING TEST TO 2' ABOVE METAL ROOF RESTROOM 505, 506 AND JANITOR 507 OK

1. WILL REQUIRE DWV TEST THRU ROOF AND WATER TEST FOR CONTINUATION
09/11/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1. AIR PIPING ON WEST SIDE OF BUILDING INSTALLED PER APPROVED PLAN
2. PUMPED WATER PIPING OVERHEAD PER PLAN TEST OK WEST SIDE
09/10/2008 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
PROVIDE APPROVED DRAWING ON SITE
08/29/2008 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
08/28/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
RESTROOM 305 & 306, WATER HEATER 304, RESTROOM 405,
ROOM 404 DWV TO 2ND LEVEL WATER TEST OK
WATER DISTRIBUTION THIS AREA OK

1. COMPLETE VENT THRU ROOF WITH TEST
08/15/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
DWV THRU ROOF FROM CENTER DIVIDER WALL WEST WITH WATER DISTRIBUTION ALL EXCEPT LINE 11 EWC's OK

SINK ADDITION DWV AND WATER ROOM 116 OK

1. WILL REQUIRE CITY APPROVED REVISION FOR THIS SINK ADDITION
08/13/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
DWV & WATER DISTRIBUTION IN GUARD HOUSE OK
CLOSET FLANGES OK FOR VINYL
08/11/2008 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
THIS INSPECTION FOR 6" RAIN DRAINS THAT ARE ALTERED FROM INSPECTION DATE OF 8/1/08, ONLY (2) 6" RAIN DRAINS ARE CURRENTLY INSTALLED WITH NO MEANS OF OVERFLOW RAIN DRAINS OR SCUPPER DRAINS FOR OVERFLOW. PLEASE SEE SECTION 1101.11 OF 2006 UPC AND HAVE CITY APPROVED PLAN ON REVISED SHEET SHOWING RAIN DRAINAGE.
08/01/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
WATER TEST (2) SETS 6" RD & OFRD AT ENTRY 101 TIE TOGETHER - 8" EXIT BLD. BELOW FINISH GRADE.
PROVIDE REVISED PLAN WITH CORRECT TERMINATION.
07/23/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
WATER DISTRIBUTION OVERHEAD WITH DROPS TO EWC
AND HOSE BIBS AND RESTROOMS 502, 503, 504 ALL OK FOR WEST HALF OF BLD EXCEPT PUMPED SYSTEM & NORTHEAST CENTER CORNER -- DWV THRU ROOF WATER TEST THRU ROOF RESTROOMS 502, 503 AND 504 OK
07/01/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
DWV THRU ROOF 1ST & 2ND LEVEL ADMINISTRATION AREA WATER TEST OK WATER DISTRIBUTION 3" FROM NORTH
WALL TO SOUTH ADMINISTRATION AREA ALL INCLUDING
ROOF HOSE BIB & TRAP PRIMER AT REMOTE AREA
06/11/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
WATER DISTRIBUTION 2 1/2 FROM 2ND LEVEL TO RESTROOMS, 117, 118, 114, 115 AND WATER HEATER AREA FOR ALL OF PAGE 4.08 OK
WATER TEST DWV TO 4' FROM EWC & FS VENT PAGE P4.10
06/09/2008 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
PROVIDE TEST ON PIPING
06/05/2008 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
DWV TEST RESTROOM AREAS 114, 115, 116, 117 WITH MOP SINK AND DRINKING FOUNTAIN 1ST LEVEL & UNDER
FLOOR FOR 2ND LEVEL DRAINAGE. INCLUDING FLOOR
SINKS PAGE P4.08
06/04/2008 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
HAVE TEST IN PLACE FOR INSPECTION
05/14/2008 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*