Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 02/12/2008 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* - UNABLE TO LOCATE BOND IN GAS PIPING - ALL VALVES ARE TO BE AGA OR CSA LISTED - INTERIORS OK |
|
| 02/11/2008 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* WEST SIDE ONLY 1. SEPARATE METER FOR EAST SIDE AND WEST SIDE 2. GAS HAS BEEN RE-ROUTED FROM UNDERGROUND TO ABOVE GRADE ALONG WALL 3. WILL REQUIRE GAS ISOMETRIC SHOWING DEVELOPED LENGTH AND TOTAL BTU CONSUMPTION 4. ALL VALVES TO BE AGA OR CSA APPROVED 5. NO TEST AT THIS TIME |