Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 02/05/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* FINISH SMOKE DETECTORS AND SEAL RACEWAYS AS DISCUSSED. |
|
| 01/16/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL A LISTED MAST BRACE AND SECURE MAST TO STRUCTURE 2. SUB-PANELS TO BE INSTALLED PER CODE AND BE WEATHERPROOF 3. CLEAN UP/SAFE OFF ALL OPEN WIRING ALONG EXTERIOR WEST WALL 4. CORRECTLY IDENTIFY PANEL DIRECTORIES INTERIOR 1. SMOKE DETECTORS TO BE INSTALLED PER MANUFACTURES INSTRUCTIONS 2. REPLACE ALL CRACKED DEVICES & COVER PLATES 3. PROVIDE GFI PROTECTION FOR KITCHEN AND BATH RECEPTACLES 4. REPAIR ALL OPEN WIRING 5. REPLACE PAINTED OVER DEVICES PARTIAL INSPECTION ONLY LICENSED ELECTRICAL CONTRACTOR TO TAKE OUT REPAIR PERMIT AND GO THROUGH STRUCTURE TO BRING INTO SAFE CONDITION |
|
| 01/15/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. ORIGINAL DNR REPORT TO BE ON SITE FOR INSPECTION 2. PROVIDE ACCESS INTO ALL INTERIOR 3. HAVE SEVERAL ELECTRICAL SAFETY CONCERNS THROUGHOUT STRUCTURE. ZANE 245-3321 |