Inspection History Details
Inspection Status: Partial Approval
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2009 | BUILDING PRE-SLAB | Partial Approval | 1. FUEL ISLAND OK TO POUR 2. PROVIDE RFI FOR 3/4 HOLD DOWN BOLTS EXPANSION INSTEAD OF 1" |
|
| 01/06/2009 | BUILDING PRE-SLAB | Partial Approval | 1. SLAB IN EQUIPMENT YARD PER S02 SHEET 10 2. NEED WET STAMPED RFI FOR EXTENSION OF EQUIPMENT PAD AND ANCHORING OF EQUIPMENT |
|
| 12/12/2008 | BUILDING PRE-SLAB | Partial Approval | 2 EQUIPMENT PADS DETAIL 10 ON S04 OK TO POUR CHECK #1834 -- $150.00 |