Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
Permit Number - T07CM04651
Inspection Description - EXT METAL CLIPS/EXT SHEATHING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/19/2008 | EXT METAL CLIPS/EXT SHEATHING | Approved | ||
03/25/2008 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE LAST INSPECTION 2) PLATFORM FOR FURNACE, H20 HTR ? (REQUIRED) 3) PLAN CALLS FOR 3/4" DIAMETER PIPE (GAS) TO RANGE, DON'T HAVE TIME TO SEE SYSTEM TODAY 4) NEED POST TENSION FIX FOR CUT IN SLAB AT FLOOR RECEPT 5) VERTICAL BACKING AT GARDEN TUB 6) PROTECT PEX FROM HEAT DBL LAV., LIGHT CANS 7) MISSING TWO HTT16 H.D.'S AT FRONT BEDROOM |
|
03/11/2008 | EXT METAL CLIPS/EXT SHEATHING | Partial Approval | IVRS - Inspection :* 1) NEED BEAM TO VIGA CONNECTION AT BACK PATIO ENGINEERED |
|
02/29/2008 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) BEAM TO VIGA CONNECTION AT BACK PATIO 2) ENGINEERING FOR 2 X 8 HEADERS WHERE PLAN CALLS FOR 2 X 10 |