Permit: T07CM04648

Parcel: 99999999A


Addresses:

3682 S WALL ST


Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T07CM04648

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
01/09/2012 ENGINEERING - FINAL Approved ALL PREVIOUS COMMENTS HAVE BEEN ADDRESSED
11/03/2011 ENGINEERING - FINAL Partial Approval ADVISED BRAD HOGUE WITH RIOWEST THAT THIS PERMIT WILL REMAIN IN A PARTIAL STATUS TILL THEY START COMPLETING THE WORK THAT REMAINS FOR THE OPEN GRADING PERMIT T08BU00196. THIS SITE WAS INSPECTED IN 2010 AND THE INCOMPLETE ITEMS HAVE NOT BEEN ADDRESSED AND COMPLETED AS OF THIS DATE. I WILL LOOK AT THIS SITE ON 11/04/2011 WITH THE PLANS TO TRY AND DETERMINE IF THERE IS ANYTHING THAT HAS NOT BEEN CONSTRUCTED OR DAMAGES THAT MAY NEED TO BE REPAIRED.
11/02/2011 ENGINEERING - FINAL Partial Approval NO APPARENT SITE CHANGES APPEAR TO HAVE BEEN MADE SINCE THE LAST 2 INSPECTIONS. COMPLETE ALL WORK ON THIS SITE AND THEN CALL FOR THE INSPECTIONS OF THE ASSOCIATED GRADING PERMIT TO BE PERFORMED. AT THAT TIME A DETERMINATION WILL BE MADE WHETHER THE SITE IS COMPLETE ENOUGH TO ALLOW FOR THE FINAL C OF O TO BE GRANTED.
08/18/2010 ENGINEERING - FINAL Partial Approval Complete the following prior to final c of o.
1) Stabilize dirt area that is used by owner to access the fenced yard.
2) Remove all envasive vegetation from the drainage channels that flow to the detention basin.
3) Remove all envasive vegetation from the basin.
4) Install chain link fence or revise plan.
11/13/2008 ENGINEERING - FINAL Partial Approval OK for Temp C of O, contractor will finish all items on punch list within 30 days
11/12/2008 ENGINEERING - FINAL Denied Contractor needs to:
1- Separate all construction activity, material and debris from public access.
2- Complete all drainage per the approved drawings.
3- Remove concrete forms from public access.
4- Replace curb line southeast side at existing curb cut.
5- Provide site cert. from engineer, per C.O.T. D.M. chapter XIV, section 14.2(7).
6- Complete all rip rap work, per approved drawings.