Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2010 | ENGINEERING - FINAL | Approved | ||
| 11/03/2009 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O ONLY, CONTRACTOR MUST ADDRESS ITEMS NUMBER 1, 2, AND 4 LISTED ON PREVIOUS INSPECTION. | |
| 10/20/2009 | ENGINEERING - FINAL | Continued | 1) CLEAN OUT AND STABILIZE (ROCK RIP RAP) AROUND ROOF DRAIN CATCH BASIN ALONG SW CORNER OF BLDG. 2) STABILIZE DIRT AREA WEST OF BLDG. 3) INSTALL 6' CHAIN LINK SECURITY FENCE WITH GATES SEE NOTE 15 4) ADD ROCK RIP RAP AT CURB CUT NEAR CONCRETE PAD SW CORNER FOR DRAINAGE. 5) INSTALL 5' WHITE STRIPED PEDESTRIAN REFUGE AREA AROUND BLDG#7. |