Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2010 | ENGINEERING - FINAL | Approved | ||
| 11/03/2009 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP ONLY PERMANENT C OF O NOT TO BE GIVEN UNTIL ITEMS NUMBER 3, 5, AND 8 LISTED ON PREVIOUS INSPECTION ARE ADDRESSED. | |
| 10/20/2009 | ENGINEERING - FINAL | Continued | 1) INSTALL 5' PEDESTRIAN REFUGE STRIPING TO AND FROM AND AROUND BLDG #5, AS SHOWN ON APPROVED PLANS. 2) INSTALL LOADING ZONE STRIPING AS SHOWN ON APPROVED PLANS. 3) INSTALL PARKING SPACES AROUND BLDG #5 SHOWN ON APPROVED PLANS - 4 ON SW CORNER OF BLDG AND 10 SPACES ALONG SOUTH EAST SIDE OF BLDG. 4) CLEAN OUT AND REMOVE FILTER FABRIC FROM BOTH CATCH BASINS NEAR BLDG #5 ONE AT FAR NW CORNER AND ONE AT THE NE CORNER OF THE BLDG. 5) INSTALL TRASH ENCLOSURE AS SHOWN ON THE APPROVED PLANS. 6) INSTALL POSTA ND CABLE BARRICADES AS SHOWN ON APPROVED PLANS. 7) COMPLETE DOORWAY PADS ALONG EAST SIDE OF BLDG#5. 8) COMPLETE CONCRETE AND ASPHALT AREA ON EAST SIDE ON BLDG #5 AS SHOWN ON APPROVED PLANS. |