Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T07CM04638
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/02/2009 | REINFORCED MASONRY PRE-GROUT | Approved | IVRS - Inspection :* | |
04/20/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT NORTH SCREEN WALL N/E CORNER |
|
04/16/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* NORTH SITE WALL @ N/E CORNER TOP OUT |
|
04/15/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
04/14/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) NORTH EAST CORNER SCREEN WALL 4' LIFT |
|
03/23/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
03/17/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* INFILL 2ND FLOOR |
|
03/16/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1. 10' OF WALL 8-12' LIFT 2ND FLOOR 2. 32" OF WALL 8' LIFT BY SERVICE PANEL 1ST FLOOR |
|
03/12/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT INFILL 2ND FLOOR |
|
03/10/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* INCOMPLETE |
|
03/09/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND FLOOR 1ST LIFT INFILL |
|
03/04/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT SOUTH WALL |
|
03/03/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 20'-24' OVER OPENING AT BASEMENT AREA |
|
02/27/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 20' LIFT OVER OPENING AT BASEMENT AREA |
|
02/26/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 16' AT OPENING, TOP OUT INTERIOR WALL AT BASEMENT AREA |
|
02/25/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* WEST SCREEN WALL 2ND LIFT NORTH OF FUEL PUMPS TOP OUT INTERIOR WALL AT BASEMENT AREA EXCEPT 4' AT EACH END NEED A FIX ON LENGTH OF REBAR, NEED 50" OVERLAP |
|
02/24/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 16'-20' INTERIOR WALL AT BASEMENT; 1ST LIFT WEST SCREEN WALL AT CORNER BY FUEL PUMP |
|
02/23/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 16' LIFT INTERIOR WALL AT BASEMENT AREA |
|
02/20/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* INCOMPLETE |
|
02/19/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3RD LIFT INTERIOR WALL AT BASEMENT AREA |
|
02/18/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* WEST SCREEN WALL TOP OUT 200' NORTH TO SOUTH |
|
02/17/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT INTERIOR WALL BASEMENT AREA |
|
02/13/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 100' WEST SCREEN WALL |
|
02/12/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) 150' 2ND LIFT SCEENWALL WEST SIDE, 1ST LIFT INTERIOR WALL AT BASEMENT AREA |
|
02/11/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* INCOMPLETE |
|
02/10/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
02/06/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* RETAIN PORTION OF SITE WALL WEST SIDE |
|
02/04/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 60' 1ST LIFT WEST SCREEN WALL | |
01/29/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 200' TOP OUT NORTH SCREEN WALL |
|
01/27/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT NORTH SCREEN WALL 200' |
|
01/26/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT SOUTH WALL |
|
01/22/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 24' LIFT SOUTH WALL |
|
01/21/2009 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
01/20/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 24' LIFT SOUTH WALL 70' 1ST LIFT SCREEN WALL EAST TO WEST |
|
01/16/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT WEST AND NORTH WALL |
|
01/15/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 28' AT WEST AND NORTH WALL, TOP OUT 80' ON NORTH SCREEN WALL |
|
01/13/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 20'-24' NORTH WALL AT BASEMENT AREA |
|
01/12/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 20-24 WEST WALL |
|
01/09/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOPOUT SCREEN WALL 160' EAST TO WEST |
|
01/07/2009 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* GRID LINE 7.0/A.0-F.0, A.0/1.0-7.0 16'-20' GRID LINE 1.0/0-4' WEST OF B.O. 1.0/4' WEST OF D.0-F.0 8-12' |
|
12/22/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) 3RD LIFT ?-? 1-2 |
|
12/19/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT NORTH SCREEN 140' EAST TO WEST |
|
12/18/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
12/16/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 16' LIFT NORTH WALL NORTH OF BASEMENT |
|
12/12/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 12' - 16' WEST WALL WEST OF BASEMENT |
|
12/11/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3RD LIFT WEST WALL WEST OF BASEMENT; 4 COLUMN PIERS NORTH SIDE |
|
12/10/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT; WEST WALL WEST OF BASEMENT, 8' - 3 COLUMNS NORTH OF BASEMENT |
|
12/09/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* GRID LINE F-G-G-H TOP OUT |
|
12/08/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* G.L G-J-3 |
|
12/05/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | TOPOUT WEST WALL; 1ST LIFT WEST BASEMENT WALL | |
12/04/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT WEST WALL SOUTH HALF |
|
12/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 28' - 30'8" WEST WALL AND NORTHWEST CORNER |
|
12/02/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT NORTH WALL; 28' LIFT WEST WALL |
|
12/01/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT AT ELEVATOR 24" AT WEST WALL AND NORTHWEST CORNER |
|
11/25/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 20'-24' ELEVATOR SHAFT; 16-20 G.L. F-G-1, F-J.3 16'-20' |
|
11/24/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* G.L F/1.0-6.0 24' 4' LIFT EAST SCREEN WALL NORTH END 20' AT ELEVATOR SHAFT |
|
11/21/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* NO PROGRESS |
|
11/20/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* G.L Q.0/2.0-2.9, 2.0/Q.0-T.0 28'-32'; 11.0-1.0-F.0 16'-20' |
|
11/19/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 24'-28' LIFT SOUTH WALL AT SE CORNER |
|
11/18/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* GL T-2.0-1.3 16' ELEVATOR SHAFT |
|
11/17/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* G.L. F/6.0-12.0 T - 6.1 - 2.0 32' |
|
11/14/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* G.L 1.0/F.0 - G.0 - 2.9/F.8 - J-3, 11.0/F.3 - J.3 F.0/1.0-6.0 12' - 16' EAST WALL ROOM 120 8'-12'7" |
|
11/13/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3RD LIFT; WEST END BUILDING 5 |
|
11/12/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT MAINTENANCE BUILDING WEST END |
|
11/06/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* G.L 2/5.5-T T.2-8 20'-34' 6.1 11' E OF Q-T 24'-28' 1-F-G 2.9/G-J.3, F.8/1.29 0' - 4' |
|
11/05/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 16'-20' CENTER INTERIOR WALL W-E |
|
11/04/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | TOPOUT STAIRWELL; 20' EAST WALL, 16' CENTER WALL W-E | |
11/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* | |
11/01/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 8'-12' ELEVATOR, TOPOUT SOUTH WALL |
|
10/30/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU (12") EXTERIOR WALLS 33'4" @ G.L Q/11-13, Q/13 - T/13 T/13-8, STAIRWELL #3 @ 32'-36' OK TO GROUT PROGRESS AREAS -- ELEVATOR #1 @ 8'-12' |
|
10/28/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* ALL SITE WALL PROGRESS OK |
|
10/27/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 32' @ STAIR 3; 30' LINE Q, 13, T FROM STAIR 3 NORTH |
|
10/23/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* PERIMETER SCREEN WALL SE CORNER TO NORTH APPROX. 180'; MID-SECTION 200' FROM N TO S APPROX. 80' -- TOPPED OUT @ 8' OK TO GROUT PROGRESS AREA |
|
10/22/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOPOUT EAST SCREEN WALL G.L 2.0/R.0-S.0 4'-8', T.0/3.7 - 8.0 12'-16' STAIRWELLS 24'-28' |
|
10/21/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 24'-28' G.L Q.0/11.0-13.0, 11.0/Q.0 - Q.7/10.0/Q.0-Q.7, Q.7/11.0-13.0 13.0/Q.0-T.0 |
|
10/16/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 16'-20' EXTERIOR WALL NORTH, EAST SIDE 200' EAST SCREEN NORTH END |
|
10/15/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT CENTER WALL, 3RD LIFT SOUTHEAST CORNER 20'-24' INTERIOR WALL, 12'-16' INTERIOR STAIRWELL |
|
10/13/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 24' - 22' CENTER WALL, 160' 1ST LIFT SOUTH SCREEN WALL |
|
10/10/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 28' - 31'4" CENTER WALL, 3RD LIFT EAST SIDE ROOM 2ND LIFT S.E CORNER, 95' 1ST LIFT, SOUTH SCREEN WALL |
|
10/09/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) 24'-28' NORTH HALF OF CENTER WALL 2) 20' TO 24 SOUTH HALF OF CENTER WALL |
|
10/06/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 16'-20' SOUTH END, 20'-24' NORTH END OF CENTER WALL |
|
10/03/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* INTERIOR 12'-16', 4' L SOUTH WALL |
|
10/01/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 12' LIFT G.L 3.7-5.3 Q.0 Q0/5.3-9.0 16' LIFT |
|
09/29/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* TOP OUT NORTH & SOUTH WALL |
|
09/25/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SOUTH AND NORTH WALL 20'-24' |
|
09/23/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* EAST WALL 12'-16' |
|
09/17/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* INCOMPLETE |
|
09/15/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 12'-14' SOUTH AND NORTH WALL |
|
09/10/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3RD LIFT INTERIOR WALLS - NORTH HALF |
|
09/08/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
09/05/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
09/04/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT INTERIOR WALLS SOUTHEAST SIDE |
|
09/02/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT NORTHEAST CORNER OFFICES |
|
09/01/2008 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
08/26/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1ST LIFT INTERIOR WALLS 100' 2ND LIFT ON SCREEN WALL EAST SIDE OF PROPERTY |
|
08/24/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3RD LIFT COLUMNS G.L 11-Q-I, I-11-4, 2ND LIFT G.L Q-R-Q-11 1ST LIFRT GL Q-11-9 |
|
08/20/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 140' LONG 1ST LIFT SCREEN WALL EAST SIDE OF PROPERTY |
|
08/19/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT SOUTH COLUMNS AND WEST WALL 1ST LIFT NORTH AND EAST WALL OF BUILDING |
|
08/12/2008 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 4' LIFT EXTERIOR COLUMNS |