Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2010 | ENGINEERING - FINAL | Approved | ||
| 11/03/2009 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O ONLY. CONTRACTOR MUST ADDRESS ITEM NUMBER 1 LISTED ON PREVIOUS INSPECTION. | |
| 10/20/2009 | ENGINEERING - FINAL | Continued | 1) RE-DIRECT ROOF DRAIN ALONG NE CORNER OF BLDG#4 IT DUMPS ONTO HC RAMP. 2) INSTALL POST AND CABLE BARRICADES AROUND WATER HARVESTING AREA AS SHOWN ON APPROVED PLANS. |