Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T07CM04635
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/30/2010 | ENGINEERING - FINAL | Approved | ||
11/03/2009 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O ONLY, CONTRACTOR MUST ADDRESS STORM DRAINAGE CONCERN IN PARKING AREA SOUTH OF BLDG. | |
10/20/2009 | ENGINEERING - FINAL | Continued | 1) REMOVE LANDSCAPE ROCK FROM HC RAMP AT NORTH SIDE OF BLDG. 2) CLEAN OUT AND REMOVEFILTER FABRIC FROM CATCH BASIN AT MAIN ENTRANCE. 3) REMOVE PORT-A-JON FROM PARKING LOT. 4) STABILIZE AREA (ROCK/HYDROSEED) SW OF BLDG #2 5) ADD SPLASH BLOCKS TO ROOF DRAINS ALONG NORTH SIDE OF BLDG #2 IN LANDSCAPE AREA. |