Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T07CM04633
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/11/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
04/21/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
04/09/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. BOND BUSHING FOR DISCONNECT 250.97 2. FINISH ITEMS 1 & 3 PREVIOUS INSPECTION |
|
04/08/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELED |
|
04/03/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. BREAKERS TO BE LISTED FOR USE BY MANUFACTURE 2. USE APPROVED WIRING METHODS FOR OUTSIDE CEILING FANS 3. PLANS NEED REVISIONS FOR PANEL SCHEDULE & LOAD CALCULATIONS PLEASE SHOW CORRECT BREAKERS FOR REWIRED EQUIPMENT IN OTHER PANELS ALSO. WE HAVE 3 - POLE BREAKERS ON 2 POLE CIRCUITS ALSO TO EQUIPMENT ROOF: 1. MAINTAIN WORKING CLEARANCES AT ALL DISCONNECTS 2. USE APPROVED FITTINGS AT JUNCTION BOX 3. FUSE ALL CONDUCTORS AT DISCONNET FOR HOOD 4. USE TERMINAL END FOR STRANDED CONDUCTORS |
|
04/01/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |