Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T07CM04570
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/24/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED BACTERIA REPORT FOR POTABLE WATER IN BLD. 1. PROVIDE CORRECT DRAINAGE FOR 2 BOWLS OF 3 COMP SINK NOTE: ONLY (1) P-TRAP PER TRAP ARM AND YOU CANNOT REDUCE DRAINAGE SIZE. REINSPECTION P.M. |
|
06/19/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. 3-COMP SINK, REQUIRES WASH & RINSE BOWLS GO TO DIRECT CONNECTION TO GREASE WASTE AND SANITIZE BOWL GOES TO INDIRECT RECEPTOR WITH 1" AIR GAP 2. PROVIDE CLEAN BACTERIA REPORT FOR POTABLE WATER |
|
04/18/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* THIS INSPECTION FOR PIPING FROM GREASE LINE THRU INTERCEPTOR AND TO BUILDING SEWER OK PROVIDE TRACER WIRE ON THIS PIPING - PRIOR TO BACKFILL NOTE: INTERCEPTOR VENT SHALL TERMINATE MINIMUM 1' FROM BUILDING WALL OR EXTEND TO 6" ABOVE TOP OF WALL |