Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T07CM04554
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/22/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* FLANGE OK |
|
04/21/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CLOSET BEND REQUIRES "DUTCHMAN" |
|
04/09/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PLUMBER FORGOT TO REDLINE P-3 ON PLAN 2. OK TO COVER UNDERGROUND OK TO COVER WALLS WILL RECHECK CLOSET FLANGE AFTER FLOOR IS POURED BUT BEFORE WC IS SET |
|
04/07/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. NO APPROVED PLAN ON SITE 2. NO REDLINES OF CHANGES 3. REQUIRE FULL SIZE UPPER TERMINAL CLEANOUT 4. CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE |
|
03/31/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
03/18/2008 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* PROVIDE CORRECT DRAINAGE FOR LAV & SINK NOTE: NO VENT CAN SERVE AS A DRAIN PROVIDE LONG RADIUS FITTINGS FOR HORIZONTAL X HORIZONTAL CHANGE OF DIRECTIONS |
|
03/06/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* NO CHANGE FROM LAST INSPECTION * SEC 311.4 2006 UPC - WASTE PIPE MAY NOT DUMP INTO A VENT * SEC 707.6 2006 UPC - CLEANOUTS SHALL BE INSTALLED VERTICALLY, ABOVE THE FLOW LINE OF THE PIPE SANTEE MAY NOT BE INSTALLED ON ITS SIDE ONLY ONE TRAP ON A TRAP ARM 1001.1 2006 UPC SEE 1002.1 2006 UPC EACH FIXTURE TRAP TO HAVE A VENT CONTRACTOR TO PAY REINSPECTION FEE |
|
02/29/2008 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* - NOT INSTALLED PER PLAN - NOT INSTALLED PER CODE - CAP OFF ALL OPEN PIPING IMMEDIATELY! - CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE |
|
02/28/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* |